New Metro incinerator would cost $1.3 billion more than planned: study

October 3, 2021 0 Comments 0 tags

Metro Vancouver is taking more heat over its plan to build a second garbage incinerator, with a new study commissioned by waste company Belkorp Environmental Services suggesting the move could

INCINERATOR SPECIFICATION Capacity UPTO 20 kg/hr

October 2, 2021 0 Comments 0 tags

Size:  940 x860x2700 mm Material:  STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL With burner:  15 C 20 KW Temperature:   PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber Easy transportation on standard EURO-pallets Constructed in a modular fashion  easy on-site movement and assembly with a minimum of equipment and technical skills; For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS  The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS  Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND Temperature resistance of the lining  at least 1,200 °C

N.D. could receive Ebola waste from Calif.

September 30, 2021 0 Comments 0 tags

FARGO, N.D. — California health officials have given notice that North Dakota is one of six states that could receive Ebola medical waste in the event the state has any

Norfolk incinerator bill wrangle could continue until after Christmas

September 29, 2021 0 Comments 0 tags

Norfolk County Council voted by 48 votes to 30 to terminate the contract for the proposed incinerator at Saddlebow at an extraordinary meeting in April. Council officers had said that,

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

September 27, 2021 0 Comments 0 tags

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS Medical Waste Incinerator, 100 to 120 Kg/hr Application   For incineration, general and pathological Capacity    100 C 120 kg/h burn rate Type Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time                Minimum 8 hours daily Operating temperature     From 850 0C to 1200 0C, Automatic controlled Residual Ash                    5 to 10% Construction Constructed from heavy duty mild or aluminized  steel Or equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium  Silicate and hot face combination of heavy duty brickwork Internal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material Charging Door                   Suitable for manual loading of wastes and with smooth  Dear seal equivalent of Ceramic seals with hinges. Door Lock                          Automatic, Electric type Ash removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamber Gratings   

Small Scale Waste Incinerator Operation Video

September 26, 2021 0 Comments 0 tags

Pyrolysis Deemed a Viable Alternative to Incinceration

September 25, 2021 0 Comments 0 tags

Researchers at the University of York have concluded that PyroPure (UK) technology has the potential to transform the way in which hazardous waste is destroyed in clinical environments and say

England’s trash generating Danish heat

September 23, 2021 0 Comments 0 tags

Power in Denmark is increasingly being generated in plants burning waste imported from England. The practice is being called an economical and environmental boon on both sides of the equation.

INCINERATOR SPECIFICATION Capacity UPTO 20 kg/hr

September 22, 2021 0 Comments 0 tags

Size:  940 x860x2700 mm Material:  STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL With burner:  15 C 20 KW Temperature:   PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber Easy transportation on standard EURO-pallets Constructed in a modular fashion  easy on-site movement and assembly with a minimum of equipment and technical skills; For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS  The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS  Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND Temperature resistance of the lining  at least 1,200 °C

Incinérateur P déchets médicaux à Atmosphere contrôlé conçu pour À 'incinération des déchets biomédicaux

September 20, 2021 0 Comments 0 tags

Incinérateur de déchets médicaux à air contrôlé conçu pour l’incinération des déchets biomédicaux générés dans un centre de traitement du sang. Les déchets à traiter comprennent principalement les biodéchets (c’est-à-dire