Power in Denmark is increasingly being generated in plants burning waste imported from England. The practice is being called an economical and environmental boon on both sides of the equation.

The AVØ incinerator in Frederikshavn produces heating and power for the area by burning trash from England.

“It is mainly construction waste like pieces of wood, cardboard and plastic from Manchester,” AVØ operations manager Orla Frederiksen told DR Nyheder. “I guess we have 600 tonnes here that provide a good combustible mixture we can then turn into district heating and power.”

Good for the bottom line
The incinerator in Frederikshavn has doubled its imports of the English waste in the past year.

Incinerators in Aalborg and Hjørring are also burning British trash.

“The heating we produce using the waste is cheaper than what we can generate with natural gas,” said AVØ head Tore Vedelsdal. “And the British are interested because they lack incinerators and pay heavy taxes on landfills.”

Good for the environment
Vedelsdal said that the environmental angle works for both countries.

“They save on having to bury the waste and we save on the consumption of natural gas,” he said.

READ MORE: Denmark pays most for electricity

Environmental protection agency Miljøstyrelsen said that last year up to 200,000 tonnes of non-hazardous waste from England was incinerated in Denmark – nearly six percent of the total volume of combustible material used.

by: http://cphpost.dk/news/englands-trash-generating-danish-heat.11398.html

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

costo del incinerador de cremación de mascotas

Alimentación intermitente (con cargador opcional): 0,9 yd3 / h (0,7 m3 / h) hasta 8 horas / día Especificaciones: Longitud total del sistema por lotes de -9′-6 ″ (2896 mm)

Norfolk incinerator bill wrangle could continue until after Christmas

Norfolk County Council voted by 48 votes to 30 to terminate the contract for the proposed incinerator at Saddlebow at an extraordinary meeting in April. Council officers had said that,

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr  Material: External- 3 layers  Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary  Combustion  Chamber: Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate