Containerized Mobile Incinerator

October 31, 2021 0 Comments 0 tags

Another challenge: disposing of waste

October 29, 2021 0 Comments 0 tags

A single Ebola patient treated in a U.S. hospital will generate eight 55-gallon barrels of medical waste each day. Protective gloves, gowns, masks and booties are donned and doffed by

County scraps plans for waste-to-energy incinerator

October 28, 2021 0 Comments 0 tags

The Board of County Commissioners struck down plans Thursday for a regional waste-to-energy incinerator, opting to haul the county’s waste to a landfill with a short-term contract instead. In a

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

October 27, 2021 0 Comments 0 tags

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr  Material: External- 3 layers  Internal lining:  a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary  Combustion  Chamber: Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate

Burnaby garbage incinerator operator sued over pollution concerns

October 25, 2021 0 Comments 0 tags

The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta Burnaby Renewable Energy ULC for allegedly failing to properly test fly ash samples from the

Hazardous situation: Incinerators at K-P’s major hospitals out of order

October 24, 2021 0 Comments 0 tags

PESHAWAR: Even with clear rules which state hospital waste must be incinerated within 24 hours of its collection, incinerators at two major hospitals in Khyber-Pakhtunkhwa (K-P) are out of order

New Incinerator ready for shipping

October 22, 2021 0 Comments 0 tags

Incinerator with Capacity of destruction in weight: 60 Kg/h.

October 21, 2021 0 Comments 0 tags

Capacity of destruction in weight: 60 Kg/h. It should be able to operate not less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by

negozio tiffany milano the whole of Europe has 423 waste incinerators

October 20, 2021 0 Comments 0 tags

Among them,tn, the steel industry produced two? English number is much higher than normal number of waste incineration. � stone hillsIncineration plant turned landscapeIn recent years, with advances in technology,

Adjumani Hospital incinerator blows up

October 18, 2021 0 Comments 0 tags

ADJUMANI. The incinerator at Adjumani Hospital, which was built four years ago, has burst due to overheating. For the past four months, support staff at the hospital have been dumping