ADJUMANI.
The incinerator at Adjumani Hospital, which was built four years ago, has burst due to overheating.

For the past four months, support staff at the hospital have been dumping medical waste within the enclosure of the incinerator instead of burning it.

The hospital administrator, Mr Michael Ojja, told Daily Monitor on Wednesday that the incinerator broke down due to continuous burning of accumulated waste from the hospital.

“The waste has increased due to the overwhelming number of admissions and people visiting the outpatient department. But we need to find solutions to protect the staff and environment,” Ojja said.

The hospital medical superintendent, Dr Dominic Drametu, said they had asked the government for construction of a new incinerator.

He said the incinerator was too small to dispose of the hospital’s voluminous medical waste.

Patients admitted to the general ward next to the incinerator expressed fear of infections arising from poor disposal of hazardous medical waste.

According to the 2013-2014 annual health sector performance report, Adjumani Hospital registers 11,731 in-patients, 83,953 outpatients and 1,695 deliveries.

Scientific facts
Incineration of heavy metals or materials with high metal content (in particular lead, mercury and cadmium) releases toxic metals to the environment and the burnt medical waste contains micro-organisms that are potentially harmful to human beings, according to WHO.

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

Burnaby garbage incinerator operator sued over pollution concerns

The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta Burnaby Renewable Energy ULC for allegedly failing to properly test fly ash samples from the

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS Medical Waste Incinerator, 100 to 120 Kg/hr Application   For incineration, general and pathological Capacity    100 C 120 kg/h burn rate Type Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time                Minimum 8 hours daily Operating temperature     From 850 0C to 1200 0C, Automatic controlled Residual Ash                    5 to 10% Construction Constructed from heavy duty mild or aluminized  steel Or equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium  Silicate and hot face combination of heavy duty brickwork Internal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material Charging Door                   Suitable for manual loading of wastes and with smooth  Dear seal equivalent of Ceramic seals with hinges. Door Lock                          Automatic, Electric type Ash removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamber Gratings   

Hazardous situation: Incinerators at K-P’s major hospitals out of order

PESHAWAR: Even with clear rules which state hospital waste must be incinerated within 24 hours of its collection, incinerators at two major hospitals in Khyber-Pakhtunkhwa (K-P) are out of order