Veolia is seeking to source non-recyclable commercial and industrial waste for its Newhaven Incinerator from areas neighbouring East Sussex and Brighton and Hove.

It argues this will allow the incinerator to produce enough energy to power 25,000 homes continuously.

But cllr Rod Main from Newhaven said this would lead to more trucks and pollution.

Veolia applied for planning permission to East Sussex County Council to lift a planning condition to enable the scheme to go ahead.

General manager for Veolia in South Downs Allan Key said the company wanted to extend the catchment area outside East Sussex and Brighton and Hove.

He said it would not lead to physical changes at the incinerator or increase to the 242,000tpa capacity.

Mr Key said: “Energy demands are going to increase year on year. Facilities such as the one we have here in Newhaven recovers energy from waste that would otherwise be lost by going to out of county landfill.”

Cllr Main said: “They need more waste to help ESCC’s carbon footprint by pumping more carbon dioxide into the atmosphere (and it’s around 100,000 tonnes pa now) not to mention how many more trucks will be coming right across Sussex from who knows where adding to the pollution.

“It’s helping to power 25,000 homes. There’s a proposed wind farm just off the coast which might power 20 times that and it won’t be pumping 100,000 tonnes of CO2 into the atmosphere every year for the next 20 or more years.”

by: http://www.sussexexpress.co.uk/news/county-news/bid-to-burn-waste-from-out-of-town-in-newhaven-incinerator-1-6388465

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

INCINERATOR SPECIFICATION Capacity UPTO 20 kg/hr

Size:  940 x860x2700 mm Material:  STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL With burner:  15 C 20 KW Temperature:   PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber Easy transportation on standard EURO-pallets Constructed in a modular fashion  easy on-site movement and assembly with a minimum of equipment and technical skills; For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS  The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS  Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND Temperature resistance of the lining  at least 1,200 °C

Adjumani Hospital incinerator blows up

ADJUMANI. The incinerator at Adjumani Hospital, which was built four years ago, has burst due to overheating. For the past four months, support staff at the hospital have been dumping

Incinérateurs HICLOVER

HICLOVER, Nanjing Clover Medical Technology Co., Ltd, fournit des solutions de système pour la protection de l’environnement médical, l’ingénierie de crémation des animaux et des animaux de compagnie, d’autres projets