Product Description

Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to sequence * High fever, long life of incinerator.  * Free or minimal installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.  * PLC Control Plane. *based on order  * New Design for pet animal cremation company.  * One year warranty on incinerator and parts in stock. 

Program Scope:  1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.  3. Community & Sea Port & Station: Municipal Solid Waste, etc.  4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Picture  
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

Google快讯 – incinerator

incinerator 实时更新 ⋅ 2021年10月6日 新闻 Centre could pave way for a burner at Alton site Alton Herald No Wey Incinerator added: "That does not appear to be sufficient for the

Google快讯 – medical waste

medical waste 实时更新 ⋅ 2021年9月2日 新闻 Cataract surgery top target for reducing emissions in health care | Mirage News Mirage News While reducing waste is important, reducing consumption has the

Google快讯 – incinerator

incinerator 实时更新 ⋅ 2021年10月20日 新闻 Islington eco fest, but what about the Edmonton incinerator? Islington Gazette Islington's eco chief refused to answer questions relating to the new incinerator being built