double chamber incinerator designed for completed combustion for waste, the first(primary) combustion chamber burn the waste directly by oil or gas burner. the secondary combustion chamber burn the smoke from the first(primary) combustion chamber. high temperature combustion will completed destroy waste and made the smoke cleaner.
double chamber incinerator fit with two burner in each chamber, but for some large incinerator, we made two or three burner for the first(primary) combustion chamber, this will made the waste burn more completed and also made high burning rate.
Um único paciente com ebola tratado em um hospital dos EUA vai gerar oito barris de 55 galões de lixo hospitalar por dia. Luvas, aventais, máscaras e botas de proteção
medical waste 实时更新 ⋅ 2021年9月28日 新闻 Hazardous Disposal Bag Market Improvement Status (2021-2027) By Analyzing the … Stillwater Current Growing demand for hazardous disposable bag from hospitals is expected to
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating : at least 450kw/hour Burner: arranged for on/off operation Maximum consumption : at least 6litres per hour Average consumption : at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor. Maximum rating : At least 450kw/hour Burner: arranged for on/off operation Maximum consumption: at least 9 litres/hour Average consumption: at least 4.5 litres /hour Flue gas treatment