Google
enviromental

实时更新 2021年9月20日
新闻

Makassar, FAJARPENDIDIKAN.co.id- Generasi Baru Indonesia (GenBI) Komisariat Universitas Negeri Makassar menggelar kegiatan Webinar Enviromental and Economic …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Tags:
[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

Hot sale small waste incinerators 30kgs and 50kgs per hour”

Items/Model TS30(PLC) TS50(PLC) Burn Rate 30 kg/hour 50 kg/hour Feed Capacity 60kg 100kg Control Mode PLC PLC Combustion Chamber 330L 560L Internal Dimensions 75x75x60cm 100x80x70cm Secondary Chamber 180L 280L Smoke

Mobile Diesel Fired Incinerator in container

Mobile Diesel Fired  Incinerator in container,  supplied with the following specifications: complete with constant ventilation fans for extraction,  factory installed inside one 20ft ISO container complete with lighting, ventilation fan, fire security, 3 access doors, and a 1200 litre fuel tank complete with a piping.  Fully containerised mobile  waste management solution for medical, animal, and industrial waste applications. Installed in Container (ISO) : 20” or its nearest equivalent model “ Tender Technical Specification Destruction rate of 50kg/hr Hot Hearth Principle Refractory insulation: a. Silicon carbide floor b. Minimum 22mm insulation thickness c. Brick lined Refractory insulation d. Three layers of refractory insulation e. Temperature Rating 1650 deg.C f. 42% alumina fire bricks Primary Chamber: a. 120Kw Burner  b. Dedicated independent fan system, damper controlled.  c. Thermostatic Sensor  d. Dimensions – 700mm x 700mm x g00mm e. Square Chamber with curved floor for liquid centralization Hot Hearth Chamber: a. 120Kw Burner b. Thermostatic Sensor  c. Minimum Temperature of 1100 deg.C as per WHO guidelines.  d. Two second retention time – Proven with CFD modeling. Steel Construction: a. constructed from 8mm & 1Omm steer plate 

Google快讯 – waste incinerator

waste incinerator 每天更新 ⋅ 2021年10月2日 新闻 German Ambassador in Albania Criticises Waste Incineration – EXIT.AL Exit – Explain Albania “Incinerating is a very costly process. All solutions should be weighed