We are having serious concern in expanding our operation in Agricultures, especially in Breeding Livestock section, which involves Pig Production as well.Our vision is to develop herd of 500,000 marketed pigs within 5 years, which supplied 1,000,000 porkers to the market yearly.
We concern how to handling with pig’s placenta and mortality from newborn pig, from piglets to weaner, from weaner to finisher (Pig Carcass Waste) . I find out that your company is a supplier which specialized in incinerator for Pig Farm so I am writing to request you consultant us what incinerator is suitable with our Pig Farms.
About the general idea, Hoa Phat would like to build 1250 Nucleus Farms (including Weaners, Gilts, Replacement) and 6000 Finisher Farms.
At our calculated, for 1 farm 1250 sows we have:
100 placentas per day (1 placenta weight ~ 200-300g)
6 newborn pigs dead per day (1 newborn weight ~ 1,5kg)
8,4 piglets dead per day (1 piglet weight ~ 3kg)
2,6 weaner dead per day  (1 weaner weight ~ 20kg)
[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

Google快讯 – medical waste

medical waste 实时更新 ⋅ 2021年10月5日 新闻 You Asked: What's the latest news on recycling in the city and county? – The State Journal State-Journal.com “Medical waste is an immediate 100%

Medical Incineraotors chamber of post combustion

1.A chamber of post combustion of gasesA burner of combustion of gases,A device of injection of air allowing a total re-combustion of gases,A device of air inlet of cooling of waste gases,A sheath of evacuation of the gases burnt,Carcass in strong sheet steel with support of connectionComposition of the refractory;Refractory concrete:Thickness :>150mmNature: 65%% of Al203Insulate in fibrous panels:Thickness: >85mmNature: CalciumBurner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.A secondary injection of air to ensure perfect oxygen content.2.A control box ensuring the complete cycle of combustion.3.Fan:Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.4.Controls and regulations:Control box watertight to dust, including:A switch circuit breaker for each engine (ventilators and burners).A timer with adjustable temporization for the regulation of each burner.A regulator with digital watching for the temperature of combustion.A regulator with digital watching for the temperature of post-combustion.Electric box.5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing.6.Process filtering system: scrubber to be mentioned as optional7.Emission standards compliance: BS 3316 or equivalent standard8.Capacity to treat plastic: not less than 40% by weight9.CE manufacturing compliance: BS EN 746-2-1997

HICLOVER Incinerator waste incinerator manufacturer in china

we are waste incinerator manufacturer in china, focus on medical waste, pet animal and other solid waste incineration treatment. waste incinerator design with single combustion chamber, double combustion chambers, three