For UN (United Nations) and AU (African Union) camp at Mogadishu international airport. We delivery 02 sets model YD-300 incinerator and shipping in 1×40′ feet high container.

300kgs per hour burning rate incinerator is well liked by market because this model can be medical waste incineration equipment for large hospital and also very good for additional solid waste treatment with lowest price, even if large size animals also can be feed into the combustion chamber. The primary combustion chamber volume is 2.4m3, large enough for common size animals. For shipping transport, YD-300 can be loaded into 40’ft full high container.

Model YD-300
Burning Rate 300 kgs/hour
Feed Capacity 500 kgs
Primary Combustion Chamber 2400 Liters
Secondary Combustion Chamber 1200 Liters
Mix Combustion Chamber Yes
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V/380V
Power 1.48Kw
Fuel Type Diesel Oil/ Natural Gas/LPG
Burner Italy Original
Oil Consumption (Diesel Oil) 26–48.1 kg/hour
Gas Consumption (Natural Gas) 16.1–48.8 m3/hour
Internal Dimensions 220 x 110 x 100cm (primary chamber)
External Dimensions 260 x 220 x 420cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 500 Liters
Door Opening 90 x 110cm
Chimney Length 10.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 8300 kgs
Operation Technical Specifications
Paimary Chamber Temperature 800℃–1000℃
Secondary Chamber Temperature 1000℃-1200℃
Residency Time 2.0 Sec.
Burning Efficiency >98%
Waste Lower Calorific Power 3000Kcal

 

 

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

Google快讯 – medical waste

medical waste 实时更新 ⋅ 2021年9月18日 新闻 Performic Acid Market To Scintillate From 2021-2031 – The Manomet Current – The Manomet Current It is one of the chemical disinfectants used to

Google快讯 – medical waste

medical waste 实时更新 ⋅ 2021年9月2日 新闻 Speak Chinese or Die! 11 of China's Top Grindcore Bands | MetalSucks MetalSucks … though everyone knows they're Chinese. Their debut album is a

HICLOVER Incinerator Would this mean that the plant would operate only 12 hours per day? Normally operating&nbs

Would this mean that the plant would operate only 12 hours per day? Normally operating the station 24 hours per day should be able to valorize 12 tons per day for an installation with a capacity of 500 kgs/hr. Would plant operations be operational on a basis of 24 hours per day, 7 days a week, all year long except for regular and preventive maintenance periods? How many hours per year could your process be operational? What would be your approach for larger projects aiming to valorize 1 000 tons per day? How much electricity could be produced using you technology based on a 1 000 tons per day installation to valorize urban wastes having a humidity factor of say 50% and a calorific value in the order of 2.5 MW/ton of wastes at the entrance of the waste-to-energy station (i.e. before pre-treatment of wastes)? What volume and characteristics of ashes would be produced from such solid wastes valorization? What would be the capital cost necessary to meet the requirement to valorize 1 000 tons per day of urban wastes? What would be the selling price of electricity per kWhour to meet targeted profitability? Could you valorize sludge volumes coming from sewage treatment plants and if so at what maximum humidity factor could you operate the station at? Considering that your process is an incineration process, oxygen will be required, therefore there will be some air emissions from the process, how can air emissions be controlled to meet environmental norms? What would be your implication in any project : would you prepare process engineering, electricity production engineering, engineering for site work, buildings, electrical hook up to existing electrical network? Do you have complete construction capabilities or would you require a local partner to carry out which portion of construction work? Would you also operate the station or use a local partner to operate the station? Can you quote a custom design that can accommodate this container size? What′s the MIN and MAX chamber temperature and its heating time from MIN to MAX temperature? Do you also manufacture the afterburner? How about the exhaust pipe?