Google
waste incinerator

每天更新 2021年10月3日
新闻

I see from your columns that once again, scientists have been asked to comment on the hugely environmentally damaging plan to install an incinerator on …

Facebook Twitter 标记为不相关

Gem-Ash, which has engineered an innovative way to make money from garbage, is expanding its six-year-old operation at a landfill in Rosemount.

Facebook Twitter 标记为不相关

Emissions from modern waste incinerators in the United Kingdom are subject to stringent health controls.” The Health Protection Agency (HPA) promised in August …

Facebook Twitter 标记为不相关

Officials of the Environmental Protection Agency maintain that law makes it binding on hospitals to keep incinerators that burn medical waste at high …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Tags:
[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

PRINCE SALMAN UNIVERSITY HOSPITAL (MINISTRY OF EDUCATION) @ AL KHARJ

 ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة  طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام  توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75  كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة   إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة  سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف  تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى  توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER  تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة  توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً  توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات      BIO MEDICAL INCENERATOR  BIO MEDICAL INCENERATOR  PLANT Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc. CAPACITY :- 200BEDS. Operation and Maintenance Manual As built Drawing in 3 set hard copy + Soft copy in Cad Testing and Commissioning  Note: The drawings  are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums  to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site  Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health  make a room for the incinerator that  accommodate three incinerators as in item 3.1.1 and attached to the  incinerator room   waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with  preparingg  incinerator building  and store with all the work of wiring, electrical and lighting systems, water supply and sanitation   supply incinerator building and the waste warehouse with   a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and  this system is linked with the hospital fire alarm systems  Supply, installation and testing of the ventilation system of the  incinerator room and the warehouse with  fans ROOF TOP EX HAUET FANS providing them with filters with high efficiency (HEPA FILTER ride to pull fans with taking the air change rate of 5 times per hour with streams and air required grilles    Supply, installation, testing separate conditioning unit for  waste repository DUCTED SPLIT UNITES and capacity sufficient to maintain the internal temperature at 14 degrees Celsius in summer and winter   Supply, installation, testing  of the cooling store of  insulated  prefabricated walls   inside the waste  room with a capacity of   35 cubic meters to save the medical waste at a temperature of zero Celsius till  burning  including the  cooling unit and all accessories 

Google快讯 – medical waste

medical waste 实时更新 ⋅ 2021年10月20日 新闻 Global Rubber Latex Thread Market to Discern Steadfast Expansion During 2021 – 2028 … Puck77 Global Medical Waste Treatment Service Market Analysis 2026: Waste

Incinerator Combustion

Product Description Waste Incinerator International Market Analytics  Date. Key Word:  Little incinerators  Medical waste incinerator  Pet animal cremation incinerator  Incinerator manufacturers  Incinerator is a incineration equipment, direct fire waste from