Google
incinerator

实时更新 2021年10月28日
新闻

The Anglican Bishop of Canberra/Goulburn says Tarago and district residents deserve to have their fair say on a proposed waste to energy plant …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Tags:
[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

محرقة نفايات صغيرة الحجم

وصف المنتج مجال التقديم 1. المستشفى والعيادة: نفايات إيتريك ، نفايات معدية ، ضماد ، نفايات حيوية ، دواء. 2. بيت الذبح ومستشفى ومزرعة الحيوانات الأليفة: حيوان ميت ، نفايات

Google快讯 – waste incinerator

waste incinerator 每天更新 ⋅ 2021年10月31日 新闻 Incinerator Market, Industry Demands and New Opportunities Analysis by 2026 – Chip … Chip Design Magazine – The Incinerator Market report offers an exhaustive

Medical Incineraotors chamber of post combustion

1.A chamber of post combustion of gasesA burner of combustion of gases,A device of injection of air allowing a total re-combustion of gases,A device of air inlet of cooling of waste gases,A sheath of evacuation of the gases burnt,Carcass in strong sheet steel with support of connectionComposition of the refractory;Refractory concrete:Thickness :>150mmNature: 65%% of Al203Insulate in fibrous panels:Thickness: >85mmNature: CalciumBurner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.A secondary injection of air to ensure perfect oxygen content.2.A control box ensuring the complete cycle of combustion.3.Fan:Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.4.Controls and regulations:Control box watertight to dust, including:A switch circuit breaker for each engine (ventilators and burners).A timer with adjustable temporization for the regulation of each burner.A regulator with digital watching for the temperature of combustion.A regulator with digital watching for the temperature of post-combustion.Electric box.5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing.6.Process filtering system: scrubber to be mentioned as optional7.Emission standards compliance: BS 3316 or equivalent standard8.Capacity to treat plastic: not less than 40% by weight9.CE manufacturing compliance: BS EN 746-2-1997