The Bangor Borough Authority will not sell the former incinerator property. Not right now, at least.

The board voted Thursday evening to support authority Chairman Donald Butz’s Oct. 2 letter to borough council President James Kresge that stated the authority need to not sell the incinerator and the surrounding home now identified collectively as the Bangor Company Park.

“Too lots of individuals had challenges with the sale,” Butz mentioned.

Negotiations were underway in the summer season that would have had the authority sell the lengthy-dormant 79-acre lot for $1.075 million to Valley Industrial Properties.

Officials discussed plans with V.I.P. who wanted to fill the deep valleys and level the steep slopes of the Ridge Road house to make it suitable for development, stated authority Administrator Marino Saveri in June.

Even so, some residents and borough officials expressed concern that dirt and landfill possibly hauled in from out of state by V.I.P. could have a potentially adverse environmental effect.

Butz decided to create a letter to the borough asking for a meeting concerning the property shortly after the authority’s September meeting when far more than a dozen residents spoke out against the sale to V.I.P.

“I will be recommending at the next authority meeting that the authority cease all activities in regard to the sale of the properties of the Bangor Company Park, and to meet with representatives of the borough council in regard to the properties,” Butz’s letter study in part.

David Houser who serves on each the borough council and the authority was the only vote on the board not in support of Butz’s letter. Houser has expressed sympathy in the previous with these who have been against the sale to V.I.P. and he did not really feel the letter had enough teeth to be meaningful.

“The letter is open-ended,” Houser said. “It doesn’t specify any dates.”

As long as the authority is in possession of the incinerator home, a sale to a landfill hauler is still achievable, mentioned Anna Maria Caldara, a Bangor resident who has been a vocal opponent of the property’s sale.

“We need to have assurances from the authority that their perspective has changed,” Caldara stated right after the meeting, “and from this point forward we need to have to know they take sustainability seriously.”

Authority and borough officials met to discuss the Bangor Company Park on Oct. 23. Any eventual plans or discussions of sale will be done in coordination with the borough council, according to Saveri.

“If we do something in the future, we will do it in conjunction with the borough,” Saveri mentioned.

The authority also voted without objection to reimburse $14,000 to Nimaris Building, which had spent dollars on various engineering permits at the incinerator website in recent years. Authority officials told Nimaris that they would get their income back if a sale did not go by means of, according to Saveri.

The house will stay dormant and closed for now. Hunters and neighbors of the property frequently make their way past the fences and really should be aware that police will be patrolling the home and trespassers will be prosecuted, Saveri said.

Our editors found this article on this site using Google and regenerated it for our readers.

[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS Medical Waste Incinerator, 100 to 120 Kg/hr Application   For incineration, general and pathological Capacity    100 C 120 kg/h burn rate Type Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time                Minimum 8 hours daily Operating temperature     From 850 0C to 1200 0C, Automatic controlled Residual Ash                    5 to 10% Construction Constructed from heavy duty mild or aluminized  steel Or equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium  Silicate and hot face combination of heavy duty brickwork Internal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material Charging Door                   Suitable for manual loading of wastes and with smooth  Dear seal equivalent of Ceramic seals with hinges. Door Lock                          Automatic, Electric type Ash removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamber Gratings   

County scraps plans for waste-to-energy incinerator

The Board of County Commissioners struck down plans Thursday for a regional waste-to-energy incinerator, opting to haul the county’s waste to a landfill with a short-term contract instead. In a

INCINERATOR SPECIFICATION Capacity UPTO 20 kg/hr

Size:  940 x860x2700 mm Material:  STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL With burner:  15 C 20 KW Temperature:   PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber Easy transportation on standard EURO-pallets Constructed in a modular fashion  easy on-site movement and assembly with a minimum of equipment and technical skills; For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS  The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS  Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND Temperature resistance of the lining  at least 1,200 °C