We finish this project in year 2010 to 2011 and delivery to Hochiminh port, Vietnam with 1×40’feet open top full container.

Large size combustion chamber up to 4.0m3 and Internal Dimensions is 257 x 147 x 108cm with feeding door opening 108 x 128cm. This model may be small waste incineration factory with very little amount of budget funds. If end customer use this for farm to burn animals like cow, horse or camel, no problem!

 

Model YD-500
Burning Rate 500 kgs/hour
Feed Capacity 800 kgs
Primary Combustion Chamber 4000 Liters
Secondary Combustion Chamber 1500 Liters
Mix Combustion Chamber Yes
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V/380V
Power 2.24Kw
Fuel Type Diesel Oil/ Natural Gas/LPG
Burner Italy Original
Oil Consumption (Diesel Oil) 31–59.1 kg/hour
Gas Consumption (Natural Gas) 19.2–64.2 m3/hour
Internal Dimensions 257 x 147 x 108cm (primary chamber)
External Dimensions 320 x 220 x 460cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 500 Liters
Door Opening 108 x 128cm
Chimney Length 14.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 13000 kgs
Operation Technical Specifications
Paimary Chamber Temperature 800℃–1000℃
Secondary Chamber Temperature 1000℃-1200℃
Residency Time 2.0 Sec.
Burning Efficiency >98%
Waste Lower Calorific Power 3000Kcal
[ecwid widgets="productbrowser search categories" default_category_id="CATEGORY_ID" default_product_id="PRODUCT_ID" lang="EN"]

Explore More

Pyrolytic Incinerator (TS20 PLC)

Basic Info. Model NO.:TS20 PLC Pullution Sources:Solid Waste Processing Processing Methods:Biology Export Markets:Global Additional Info. Trademark:Clover Packing:Wooden Carton Origin:China Production Capacity:1500 Units/Year Product Description Nanjing Clover Medical Technology Co., Ltd.

Google快讯 – incinerator

incinerator 实时更新 ⋅ 2021年10月5日 新闻 ZWE warns against the use of carbon capture and storage technology | Resource Magazine Resource Magazine It warns that investing in CCS for municipal waste

Google快讯 – incinerator

incinerator 实时更新 ⋅ 2021年10月7日 新闻 Options being explored for future of Wellington landfill – NZ Herald New Zealand Herald Four options, prepared by engineering firms BECA and Fichtner, include investing